Case study: Porterbrook Long Marston Rail Innovation Centre

An infrastructure upgrade project

BTS Ltd. were engaged from Dec 2023 to April 2026 to provide the following

client side roles for the infrastructure upgrade project at Porterbrook's Long Marston

site:

  • Designated Project Engineer (DPE)
  • E&P Project Engineer (PE)
  • OLE Project Engineer
  • Signalling Project Engineer
  • Civils Project Engineer
  • Snr. Construction Manager
  • Construction Manager
  • Maintenance Support Engineer
  • Assistant Project Manager
  • H&S Manager
  • Lead Test Engineer (Integration Testing)


In addition, BTS Ltd. fulfilled the CDM roles of Principal Designer (PD) and Principal

Contractor (PC).


The scope of the project was:


  • A new 25kV traction power substation from local 11kV supply (Siemens Rail
  • Charging Converter (RCC)); a world first
  • A new electrified (Siemens SICAT SX OLE) high speed 3km test track and
  • new sidings (some electrified)
  • A new Siemens WestCAD signalling system for the test track
  • A new two storey Depot Control Centre where signalling and traction power
  • are controlled
  • A new HGV compatible vehicle underpass to permit access to site
  • Commissioning and integration testing of the new systems


The BTS Ltd. resources formed the entire client technical and construction

management teams for all the new assets in the project scope.


In addition to the technical specs, the BTS Ltd. scope also included the following:


  • Requirements writing on behalf of the client
  • Ensuring compliance to British, RSSB and Network Rail Standards
  • Application of CSM-RA and management of the Project Hazard Record
  • including chairing HAZID and HAZOP workshops
  • Liason with Porterbrook Site Operations team to ensure seamless operation
  • of the new assets
  • Liason with ApBo and DeBo to provide electrified test track independent
  • certification
  • Construction management of three Tier 1 suppliers
  • Design management of multiple designers including IDC/IDR and DRN reviews
  • Liason with National Grid for the new railway 25kV traction supply
  • Attendance at Porterbrook Safety Review Panel (SRP)
  • Systems assurance via Form E, Form F and ECC
  • Handback and Health & Safety files


The BTS deployed team were engaged from GRIP stage 1 and remained in role until

completion of GRIP stage 8 in early 2026.

Long Marston

Contact us

Contact us

BTS Group

To discuss your requirements and how we can help, please get in touch.

enquiries@btsgroup.net +44 (0)7894 551427

Drop us a line!

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Copyright © 2026 BTS Group - All Rights Reserved.

  • Who we are
  • What we do
  • Contact us
  • Privacy Policy
  • Cookie policy

This website uses cookies.

We use cookies to analyse website traffic and optimise your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept